ITAC Assessment: UF0598
ITAC logo
ITAC Assessment: UF0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Personal Care Products
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 190,000
ft2
Annual Production 106,863,526
units
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,672 6,405,136
kWh
Electricity Demand $227,953 15,753
kW-mo/yr
Electricity Fees $100,456 -
Natural Gas $186,251 26,700
MMBtu
TOTAL YEARLY COSTS $900,332
RECOMMENDED SAVINGS* $276,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $151,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $94,792 $289,896 $39,227
653,776
kWh
$55,565
-
kW-mo/yr
- -
02 2.3191: Use demand controller or load shedder $61,221 $34,460 $38,431
640,514
kWh
$22,790
-
kW-mo/yr
- -
03 2.3141: Use battery storage for demand control $30,832 $8,310 $(-300.0)
(-5,000)
kWh
$(-868.0)
-
kW-mo/yr
- $32,000
04 2.6231: Utilize controls to operate equipment only when needed $26,906 $25,280 $26,906
448,737
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $19,433 $14,328 $11,944
199,064
kWh
$7,489
-
kW-mo/yr
- -
06 2.2622: Replace existing chiller with high efficiency model $10,556 $22,000 $7,338
122,298
kWh
$3,218
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,338 $432 $9,338
155,628
kWh
- - -
08 2.7272: Install heat pipes / raise cooling setpoint $8,114 - $8,114
135,241
kWh
- - -
09 2.1222: Install turbulators $6,732 $7,500 - - $6,732
-
MMBtu
-
10 2.1113: Reduce combustion air flow to optimum $5,588 $2,800 - - $5,588
-
MMBtu
-
11 2.7425: Clean or color roof to reduce solar load $3,193 $15,120 $3,193
53,217
kWh
- - -
TOTAL RECOMMENDED $276,705 $420,126 $144,191
2,403,475
kWh
$88,194
-
kW-mo/yr
$12,320
-
MMBtu
$32,000
TOTAL IMPLEMENTED $151,814 $89,830 $74,865
1,247,745
kWh
$32,629
-
kW-mo/yr
$12,320
-
MMBtu
$32,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs