Assessment Year | 2000 |
---|---|
Principal Product | Acoustical Pads |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 209 |
Plant Area |
132,000
ft2
|
Annual Production | 32,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $351,252 | 9,231,243 |
kWh
|
$0.038 |
Electricity Demand | $207,786 | 23,064 |
kW-mo/yr
|
$9.01 |
Electricity Fees | $79,299 | - |
|
- |
Natural Gas | $104,752 | 29,564 |
MMBtu
|
$3.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,118 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $3,316 | $500 |
$2,230
59,789
kWh
|
$1,086
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,563 | $50 |
$2,394
64,185
kWh
|
$1,169
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,733 | $600 |
$2,510
67,116
kWh
|
$1,223
-
kW-mo/yr
|
- | - | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $225 | $750 | - | - |
$225
-
MMBtu
|
- | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $6,353 | $7,000 | - | - |
$6,353
-
MMBtu
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,328 | $2,500 | - | - |
$1,328
-
MMBtu
|
- | - | |
07 | 3.5311: Recover and reuse waste material | $30,000 | $5,000 | - | - | - | - | $30,000 | |
08 | 3.4115: Recover and reuse cooling water | $21,600 | $5,000 | - | - | - |
$21,600
-
Tgal
|
- | |
TOTAL RECOMMENDED | $70,118 | $21,400 |
$7,134
191,090
kWh
|
$3,478
-
kW-mo/yr
|
$7,906
-
MMBtu
|
$21,600
-
Tgal
|
$30,000 | ||
TOTAL IMPLEMENTED | $30,000 | $5,000 | - | - | - | - | $30,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs