ITAC Assessment: UW2411
ITAC logo
ITAC Assessment: UW2411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Sewage Treatment Facilities
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 156,234
ft2
Annual Production 400
ton
Production Hrs. Annual 4,928
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,120 3,625,552
kWh
Fuel Oil #1 $11,303 331
MMBtu
TOTAL YEARLY COSTS $133,423
RECOMMENDED SAVINGS* $7,988 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #1 Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $177 $715 $27
809
kWh
- $150 -
02 2.4134: Replace electric motor with fossil fuel engine $5,536 - $(-116.0)
(-3,446)
kWh
$5,652
-
MMBtu
- -
03 2.4321: Upgrade obsolete equipment $2,275 - - $5,652
-
MMBtu
- $(-3,377.0)
TOTAL RECOMMENDED $7,988 $715 $(-89.0)
(-2,637)
kWh
$11,304
-
MMBtu
$150 $(-3,377.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs