ITAC Assessment: UM0145
ITAC logo
ITAC Assessment: UM0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3571: Electronic Computers
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 24,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 4,675
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,947 1,038,101
kWh
Electricity Demand $39,300 3,120
kW-mo/yr
Electricity Fees $(-1,769.0) -
Natural Gas $14,977 3,248
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $151,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Primary Product Savings
01 2.4221: Install compressor air intakes in coolest locations $1,720 $300 $1,065
21,102
kWh
$655
-
kW-mo/yr
- - - - -
02 2.7231: Use radiant heater for spot heating $2,157 $4,500 - - - $2,157
-
MMBtu
- - -
03 2.8114: Change rate schedules or other changes in utility service $14,970 $40,000 - - $14,970 - - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,978 $11,600 $7,000
113,716
kWh
$4,133
-
kW-mo/yr
- $(-2,155.0)
-
MMBtu
- - -
05 3.3132: Use reverse osmosis to concentrate material $50,143 $85,000 - - - - $50,143
-
Tgal
- -
06 3.3126: Use absorption, extraction to remove contaminants $24,222 $60,000 - - - - - $24,222
-
gal
-
07 4.424: Improve space comfort conditioning $16,869 $14,495 - - - - - - $16,869
08 4.442: Install magazines for temporary storage $32,500 $2,000 - - - - - - $32,500
TOTAL RECOMMENDED $151,559 $217,895 $8,065
134,818
kWh
$4,788
-
kW-mo/yr
$14,970 $2
-
MMBtu
$50,143
-
Tgal
$24,222
-
gal
$49,369
TOTAL IMPLEMENTED $42,811 $74,795 $1,065
21,102
kWh
$655
-
kW-mo/yr
- - - $24,222
-
gal
$16,869
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs