ITAC Assessment: CW0119
ITAC logo
ITAC Assessment: CW0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Machine Rail Parts
NAICS 334519: Other Measuring and Controlling Device Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 120,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,221 2,000,200
kWh
Electricity Demand $61,661 4,195
kW-mo/yr
Electricity Fees $24,072 -
Natural Gas $20,274 3,576
MMBtu
Waste Disposal Costs
Water Usage $1,947 216
Tgal
Other Liquid (non-haz) $48,309 2,750
gal
TOTAL YEARLY COSTS $246,483
RECOMMENDED SAVINGS* $48,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,425

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $4,804 - $4,804
114,864
kWh
- -
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,402 $1,640 $3,402
81,358
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,554 - $3,554
84,972
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $1,741 $613 $1,741
41,634
kWh
- -
05 2.4322: Use or replace with energy efficient substitutes $8,381 $6,000 $2,696
64,467
kWh
$5,685
-
kW-mo/yr
-
06 2.4312: Improve lubrication practices $21,048 $10,400 - - $21,048
-
gal
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $5,837 $1,000 $5,837
139,581
kWh
- -
TOTAL RECOMMENDED $48,768 $19,653 $22,034
526,877
kWh
$5,685
-
kW-mo/yr
$21,048
-
gal
TOTAL IMPLEMENTED $22,425 $8,640 $16,739
400,271
kWh
$5,685
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs