Assessment Year | 1998 |
---|---|
Principal Product | Soft Trim Automotive |
NAICS |
n/a
|
SIC | 2396: Automotive Trimmings, Apparel Findings, and Related Products |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
70,000
ft2
|
Annual Production | 6,500,000
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $27,069 | 753,224 |
kWh
|
$0.036 |
Electricity Demand | $31,963 | 4,848 |
kW-mo/yr
|
$6.59 |
Electricity Fees | $498 | - |
|
- |
Natural Gas | $18,108 | 4,510 |
MMBtu
|
$4.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,945 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,945 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $249 | $540 |
$131
3,810
kWh
|
$118
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,708 | $8,483 |
$1,000
30,774
kWh
|
$708
-
kW-mo/yr
|
- | - | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $3,449 | - |
$3,006
83,236
kWh
|
$443
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $801 | $100 |
$749
2,345
kWh
|
$52
-
kW-mo/yr
|
- | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $8,468 | $6,750 | - | - |
$8,468
-
MMBtu
|
- | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $13,420 | $5,200 | - | - | - |
$13,420
-
lb
|
- | |
07 | 3.1192: Reduce scrap production | $1,690 | $500 | - | - | - |
$1,690
-
lb
|
- | |
08 | 4.122: Develop standard procedures to improve internal yields | $8,160 | $2,500 | - | - | - | - | $8,160 | |
TOTAL RECOMMENDED | $37,945 | $24,073 |
$4,886
120,165
kWh
|
$1,321
-
kW-mo/yr
|
$8,468
-
MMBtu
|
$15,110
-
lb
|
$8,160 | ||
TOTAL IMPLEMENTED | $37,945 | $24,073 |
$4,886
120,165
kWh
|
$1,321
-
kW-mo/yr
|
$8,468
-
MMBtu
|
$15,110
-
lb
|
$8,160 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs