ITAC Assessment: CO0491
ITAC logo
ITAC Assessment: CO0491
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Napkins,bathroom tissue and paper bags
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 253,700
ft2
Annual Production 24,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,639 5,372,000
kWh
Electricity Demand $40,015 853
kW-mo/yr
Electricity Fees $82,321 -
Natural Gas $29,828 3,785
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $82,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $20,780 $61,010 $12,950
228,300
kWh
$7,830
-
kW-mo/yr
- - - -
02 2.2437: Recover waste heat from equipment $10,820 $4,110 - - $10,820
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,740 $570 $4,470
113,100
kWh
$2,050
-
kW-mo/yr
- $(-780.0) - -
04 2.4238: Do not use compressed air for personal cooling $3,630 $1,000 $2,050
51,900
kWh
$1,580
-
kW-mo/yr
- - - -
05 2.4239: Eliminate or reduce compressed air usage $1,870 $1,300 $1,240
31,300
kWh
$630
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,550 - $2,590
65,500
kWh
$1,270
-
kW-mo/yr
- $(-520.0) $(-1,790.0) -
07 2.7135: Install occupancy sensors $220 $210 $150
3,700
kWh
$70
-
kW-mo/yr
- - - -
08 4.651: Install back-up equipment $54,170 $84,380 - - - - - $54,170
TOTAL RECOMMENDED $98,780 $152,580 $23,450
493,800
kWh
$13,430
-
kW-mo/yr
$10,820
-
MMBtu
$(-1,300.0) $(-1,790.0) $54,170
TOTAL IMPLEMENTED $82,560 $147,260 $18,660
372,700
kWh
$10,510
-
kW-mo/yr
- $(-780.0) - $54,170
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs