ITAC Assessment: UM0084
ITAC logo
ITAC Assessment: UM0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Automotive Assembly Lines
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 51,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 4,186
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,104 1,181,125
kWh
Electricity Fees $5,608 -
Natural Gas $28,227 7,483
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,163

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $547 $900 $547
5,569
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,724 $39,196 $8,724
87,632
kWh
- - - -
03 2.8114: Change rate schedules or other changes in utility service $10,308 $40,000 - - - $10,308 -
04 2.4221: Install compressor air intakes in coolest locations $735 $600 $735
7,034
kWh
- - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,333 $1,400 - $2,333
-
MMBtu
- - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $583 - - - $583
-
lb
- -
07 3.5313: Increase amount of waste recovered for resale $279 - - - $279
-
lb
- -
08 3.5316: Contract a wood pallet recycling company $37,448 $1,200 - - $37,448
-
lb
- -
09 4.431: Train operators for maximum operating efficiency $9,060 $6,710 - - - - $9,060
TOTAL RECOMMENDED $70,017 $90,006 $10,006
100,235
kWh
$2,333
-
MMBtu
$38,310
-
lb
$10,308 $9,060
TOTAL IMPLEMENTED $60,163 $49,910 $735
7,034
kWh
$2,333
-
MMBtu
$37,727
-
lb
$10,308 $9,060
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs