ITAC Assessment: UF0509
ITAC logo
ITAC Assessment: UF0509
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Disposable Plastic Leads
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 300,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $395,753 6,116,734
kWh
Electricity Demand $198,836 16,721
kW-mo/yr
TOTAL YEARLY COSTS $594,589
RECOMMENDED SAVINGS* $57,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,087

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4225: Install common header on compressors $5,078 $10,260 $4,857
75,062
kWh
$222
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $4,408 $940 $4,225
65,307
kWh
$183
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,560 - $1,471
22,729
kWh
$89
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,157 $844 $2,157
33,337
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,130 $3,321 $1,076
16,635
kWh
$53
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $1,241 $1,280 $1,241
19,177
kWh
- -
07 3.5215: Avoid contamination of end pieces and reuse as feed stock $42,000 - - - $42,000
TOTAL RECOMMENDED $57,573 $16,645 $15,027
232,247
kWh
$546
-
kW-mo/yr
$42,000
TOTAL IMPLEMENTED $48,087 $5,445 $5,945
91,878
kWh
$142
-
kW-mo/yr
$42,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs