ITAC Assessment: GT0563
ITAC logo
ITAC Assessment: GT0563
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Peanut Butter
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 83,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 5,100
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $399,782 6,289,273
kWh
Natural Gas $123,343 24,593
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $123,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $38,980 $40,300 - $38,980
-
MMBtu
-
02 3.4115: Recover and reuse cooling water $37,645 $14,400 $(-3,055.0)
(-48,066)
kWh
- $40,700
-
Tgal
03 2.4133: Use most efficient type of electric motors $24,290 $61,590 $24,290
416,178
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $20,710 $25,040 $20,710
333,822
kWh
- -
05 2.3132: Recharge batteries on during off-peak demand periods $2,150 - $2,150
-
kWh
- -
TOTAL RECOMMENDED $123,775 $141,330 $44,095
701,934
kWh
$38,980
-
MMBtu
$40,700
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs