ITAC Assessment: UM0064
ITAC logo
ITAC Assessment: UM0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Steel, Cold Roll Sheet, Strip and Bars
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 196,000
ft2
Annual Production 95,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $467,616 5,949,004
kWh
Electricity Demand $291,563 17,328
kW-mo/yr
Electricity Fees $(-281.0) -
Natural Gas $63,789 17,004
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $557 $400 n/a $388
7,327
kWh
$169
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $13,487 $7,548 n/a - $13,487
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,967 $4,130 n/a $2,870
22,567
kWh
$1,097
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $5,525 $1,000 n/a $3,843
72,392
kWh
$1,682
-
kW-mo/yr
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $413 $2,025 n/a - - $413
-
MMBtu
-
06 3.1191: Change procedures / equipment / operating conditions $3,420 $852 n/a - - - $3,420
-
lb
TOTAL RECOMMENDED $27,369 $15,955 $7,101
102,286
kWh
$16,435
-
kW-mo/yr
$413
-
MMBtu
$3,420
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs