ITAC Assessment: UM0003
ITAC logo
ITAC Assessment: UM0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Pickling and Galvanizing Steel Rolls
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 168,000
ft2
Annual Production 375,000
ton
Production Hrs. Annual 8,112
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $556,530 8,021,102
kWh
Natural Gas $590,829 179,754
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,607 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $28,560 $49,340 $28,560
414,127
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,804 - $12,804
121,043
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $470 $400 $470
6,741
kWh
-
04 2.6231: Utilize controls to operate equipment only when needed $4,462 $2,000 $4,462
67,409
kWh
-
05 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $52,311 $39,200 - $52,311
-
MMBtu
TOTAL RECOMMENDED $98,607 $90,940 $46,296
609,320
kWh
$52,311
-
MMBtu
TOTAL IMPLEMENTED $29,030 $49,740 $29,030
420,868
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs