ITAC Assessment: MS0033
ITAC logo
ITAC Assessment: MS0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Cast Aluminum Parts
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area 80,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $322,147 6,166,178
kWh
Natural Gas $353,495 126,511
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $177,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,542

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $16,206 $7,500 $16,206
-
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $4,336 $2,170 $4,336
94,959
kWh
-
03 2.7261: Install timers and/or thermostats $393 $730 $393
12,603
kWh
-
04 2.2437: Recover waste heat from equipment $3,552 $5,640 - $3,552
-
MMBtu
05 2.1213: Direct warmest air to combustion intake $152,895 $101,700 - $152,895
-
MMBtu
TOTAL RECOMMENDED $177,382 $117,740 $20,935
107,562
kWh
$156,447
-
MMBtu
TOTAL IMPLEMENTED $20,542 $9,670 $20,542
94,959
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs