ITAC Assessment: WV0037
ITAC logo
ITAC Assessment: WV0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Lawn and Garden Equipment
NAICS
n/a
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $50
M
to 100
M
# of Employees 415
Plant Area 210,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,051 9,315,944
kWh
Natural Gas $56,987 11,918
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $536 $214 $536
22,274
kWh
02 2.4133: Use most efficient type of electric motors $956 $28,300 $956
6,448
kWh
03 2.4221: Install compressor air intakes in coolest locations $2,464 $1,220 $2,464
63,013
kWh
04 2.4314: Use synthetic lubricant $592 - $592
24,619
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,076 - $1,076
44,549
kWh
06 2.7241: Install outside air damper / economizer on hvac unit $7,549 $3,168 $7,549
312,427
kWh
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $835 $2,000 $835
34,584
kWh
TOTAL RECOMMENDED $14,008 $34,902 $14,008
507,914
kWh
TOTAL IMPLEMENTED $3,956 $29,734 $3,956
91,735
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs