ITAC Assessment: MZ0363
ITAC logo
ITAC Assessment: MZ0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Overmold and seat support, Flex mat and seat backs
NAICS 332613: Spring Manufacturing
SIC 3493: Steel Springs, Except Wire
Sales Range $10
M
to 50
M
# of Employees 285
Plant Area 109,000
ft2
Annual Production 6,500
ton
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $703,379 10,333,200
kWh
Electricity Demand $314,220 20,746
kW-mo/yr
Electricity Fees $13,321 -
Natural Gas $108,915 7,521
MMBtu
TOTAL YEARLY COSTS $1,139,835
RECOMMENDED SAVINGS* $91,096 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.9114: Use solar heat to make electricty $68,717 $580,125 $68,717
1,009,055
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,670 $29,120 $6,666
97,878
kWh
$4,004
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,485 $2,460 $4,815
70,708
kWh
$1,470
-
kW-mo/yr
$(-800.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,224 $7,680 $4,770
70,044
kWh
$1,454
-
kW-mo/yr
-
TOTAL RECOMMENDED $91,096 $619,385 $84,968
1,247,685
kWh
$6,928
-
kW-mo/yr
$(-800.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs