| Assessment Year | 1994 |
|---|---|
| Principal Product | Stamped Automotive Parts |
| NAICS |
n/a
|
| SIC | 3465: Automotive Stampings |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
150,000
ft2
|
| Annual Production | 20,000
ton
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $297,490 | 5,894,783 |
kWh
|
$0.050 |
| Natural Gas | $33,367 | 7,209 |
MMBtu
|
$4.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $73,091 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $42,994 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $6,352 | $15,040 |
$6,352
127,198
kWh
|
- | |
| 02 | 2.6218: Turn off equipment when not in use | $3,815 | - |
$3,815
76,495
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,040 | $34,841 |
$11,040
220,985
kWh
|
- | |
| 04 | 2.7131: Add area lighting switches | $4,248 | - |
$4,248
84,994
kWh
|
- | |
| 05 | 2.3212: Optimize plant power factor | $10,300 | $18,603 |
$10,300
-
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,772 | $1,380 |
$6,772
135,404
kWh
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,985 | $1,000 |
$1,985
39,859
kWh
|
- | |
| 08 | 2.6218: Turn off equipment when not in use | $1,932 | - |
$1,932
38,687
kWh
|
- | |
| 09 | 2.7314: Reduce ventilation air | $21,861 | $25,000 | - |
$21,861
-
MMBtu
|
|
| 10 | 2.7442: Keep doors and windows shut when not on use | $4,786 | $1,700 | - |
$4,786
-
MMBtu
|
|
| TOTAL RECOMMENDED | $73,091 | $97,564 |
$46,444
723,622
kWh
|
$26,647
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $42,994 | $41,740 |
$16,347
327,374
kWh
|
$26,647
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs