ITAC Assessment: UK1913
ITAC logo
ITAC Assessment: UK1913
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Mattress Springs
NAICS 337910: Mattress Manufacturing
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $50
M
to 100
M
# of Employees 310
Plant Area 319,000
ft2
Annual Production 72,622,211
lb
Production Hrs. Annual 6,864
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,238 8,262,680
kWh
Electricity Demand $405,719 23,463
kW-mo/yr
Electricity Fees $29,765 -
Natural Gas $74,689 13,248
MMBtu
Waste Disposal Costs
Water Usage $9,838 1,618
Tgal
Water Disposal $18,561 1,618
Tgal
Other Liquid (non-haz) $3,536 1
gal
TOTAL YEARLY COSTS $781,346
RECOMMENDED SAVINGS* $67,233 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,051

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,855 $2,510 $7,763
267,696
kWh
$8,092
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $5,474 $16,000 $1,774
61,158
kWh
$3,700
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $9,642 $2,520 $4,679
161,320
kWh
$4,963
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $3,111 $550 $1,036
35,741
kWh
$2,075
-
kW-mo/yr
- -
05 2.7444: Close holes and openings in building such as broken windows $632 $62 - - - $632
-
MMBtu
06 2.7135: Install occupancy sensors $333 $1,120 $333
11,473
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $8,770 $32,561 $3,790
130,689
kWh
$4,980
-
kW-mo/yr
- -
08 2.4133: Use most efficient type of electric motors $243 $127 $119
4,104
kWh
$124
-
kW-mo/yr
- -
09 2.2511: Insulate bare equipment $8,076 $3,569 $4,201
144,846
kWh
- - $3,875
-
MMBtu
10 2.3212: Optimize plant power factor $15,097 $10,570 - - $15,097 -
TOTAL RECOMMENDED $67,233 $69,589 $23,695
817,027
kWh
$23,934
-
kW-mo/yr
$15,097 $4,507
-
MMBtu
TOTAL IMPLEMENTED $53,051 $49,958 $17,720
611,023
kWh
$20,234
-
kW-mo/yr
$15,097 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs