ITAC Assessment: KU0205
ITAC logo
ITAC Assessment: KU0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CORRUGATED BOXES
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,893 386,870
kWh
Natural Gas $14,966 3,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,575

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,437 $2,317 $4,437
49,238
kWh
- -
02 2.7261: Install timers and/or thermostats $3,717 $1,000 - $3,717
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,773 $150 $2,773
30,774
kWh
- -
04 2.4312: Improve lubrication practices $1,162 $615 $1,162
12,896
kWh
- -
05 2.1123: Install automatic stack damper $1,085 $1,500 - $1,085
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $648 - - $948
-
MMBtu
$(-300.0)
07 2.4322: Use or replace with energy efficient substitutes $396 - $396
4,396
kWh
- -
TOTAL RECOMMENDED $14,218 $5,582 $8,768
97,304
kWh
$5,750
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $11,575 $3,467 $7,210
80,012
kWh
$4,665
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs