ITAC Assessment: UK1601
ITAC logo
ITAC Assessment: UK1601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Mining Machinery
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 137
Plant Area 80,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,690 1,889,787
kWh
Electricity Demand $37,837 6,943
kW-mo/yr
Electricity Fees $5,226 -
Natural Gas $75,255 9,579
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $5,045 $7,350 - - $5,045 - -
02 2.7313: Recycle air for heating, ventilation and air conditioning $19,178 $60,000 - - - $19,178
-
MMBtu
-
03 2.7224: Reduce space conditioning during non-working hours $1,523 - $918
10,312
kWh
- - $605
-
MMBtu
-
04 2.4322: Use or replace with energy efficient substitutes $5,569 $3,000 $3,999
44,928
kWh
$1,570
-
kW-mo/yr
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,706 $750 - - - $1,706
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $43,798 $34,110 $44,116
495,686
kWh
$4,812
-
kW-mo/yr
- - $(-5,130.0)
07 2.7135: Install occupancy sensors $849 $175 $849
9,540
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $495 $707 $344
3,868
kWh
$29
-
kW-mo/yr
- - $122
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,047 $1,200 $1,047
11,760
kWh
- - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $315 - $315
3,540
kWh
- - - -
11 2.4221: Install compressor air intakes in coolest locations $309 $710 $309
3,474
kWh
- - - -
12 2.6218: Turn off equipment when not in use $1,351 - $1,351
15,185
kWh
- - - -
13 2.4111: Utilize energy-efficient belts and other improved mechanisms $192 - $192
2,155
kWh
- - - -
TOTAL RECOMMENDED $81,377 $108,002 $53,440
600,448
kWh
$6,411
-
kW-mo/yr
$5,045 $21,489
-
MMBtu
$(-5,008.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs