ITAC Assessment: UK1408
ITAC logo
ITAC Assessment: UK1408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Sound Insulation Material
NAICS 327993: Mineral Wool Manufacturing
SIC 3296: Mineral Wool
Sales Range $50
M
to 100
M
# of Employees 380
Plant Area 250,000
ft2
Annual Production 11,700,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,044,255 27,516,000
kWh
Electricity Demand $418,386 49,867
kW-mo/yr
Electricity Fees $137,729 -
Natural Gas $997,714 138,270
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $904,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1131: Repair faulty insulation in furnaces, boilers, etc $15,613 $3,894 $11,658
306,789
kWh
$3,955
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,448 $2,000 $6,448
169,680
kWh
- - - -
03 2.4224: Upgrade controls on compressors $7,600 $17,000 $7,600
200,000
kWh
- - - -
04 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $40,960 $204,000 $889
23,400
kWh
- - $40,071
-
MMBtu
-
05 2.3212: Optimize plant power factor $36,000 $32,528 - - $36,000 - -
06 2.2437: Recover waste heat from equipment $217,346 $140,476 - - - $217,346
-
MMBtu
-
07 2.4239: Eliminate or reduce compressed air usage $580,500 $386,500 $8,748
230,213
kWh
$4,752
-
kW-mo/yr
- - $567,000
-
lb
TOTAL RECOMMENDED $904,467 $786,398 $35,343
930,082
kWh
$8,707
-
kW-mo/yr
$36,000 $257,417
-
MMBtu
$567,000
-
lb
TOTAL IMPLEMENTED $42,448 $34,528 $6,448
169,680
kWh
- $36,000 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs