ITAC Assessment: MS0267
ITAC logo
ITAC Assessment: MS0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Recliner Mechanisms
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 357
Plant Area 290,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $296,259 8,197,145
kWh
Electricity Demand $209,244 21,769
kW-mo/yr
Electricity Fees $9,892 -
Natural Gas $107,220 14,717
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,747

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $30,643 $45,270 - - $30,643
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,354 $141,305 $11,965
331,174
kWh
$9,276
-
kW-mo/yr
$(-2,887.0)
03 2.7261: Install timers and/or thermostats $1,157 $2,124 $1,340
37,085
kWh
- $(-183.0)
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $750 $228 $869
24,064
kWh
- $(-119.0)
05 2.7229: Air condition only space necessary $613 $240 $235
6,515
kWh
$474
-
kW-mo/yr
$(-96.0)
06 2.8114: Change rate schedules or other changes in utility service $128 - - - $128
TOTAL RECOMMENDED $51,645 $189,167 $14,409
398,838
kWh
$9,750
-
kW-mo/yr
$27,486
TOTAL IMPLEMENTED $49,747 $186,803 $12,834
355,238
kWh
$9,276
-
kW-mo/yr
$27,637
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs