ITAC Assessment: MU0011
ITAC logo
ITAC Assessment: MU0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Plastic Vehicle Exteriors
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 120,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $536,350 7,007,862
kWh
Electricity Demand $214,470 16,078
kW-mo/yr
Electricity Fees $68,332 -
Natural Gas $550,996 72,835
MMBtu
Waste Disposal Costs
Water Usage $26,656 8,728
Tgal
Water Disposal $86,738 8,728
Tgal
TOTAL YEARLY COSTS $1,483,542
RECOMMENDED SAVINGS* $46,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $361 - $281
3,120
kWh
$80
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $32,543 $74 $6,107
67,859
kWh
- $26,436
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $13,523 $284 $680
7,560
kWh
- $12,843
-
MMBtu
04 2.7444: Close holes and openings in building such as broken windows $320 $200 $223
2,479
kWh
- $97
-
MMBtu
TOTAL RECOMMENDED $46,747 $558 $7,291
81,018
kWh
$80
-
kW-mo/yr
$39,376
-
MMBtu
TOTAL IMPLEMENTED $14,204 $484 $1,184
13,159
kWh
$80
-
kW-mo/yr
$12,940
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs