ITAC Assessment: UF0643
ITAC logo
ITAC Assessment: UF0643
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Ice Cream
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 40,000
ft2
Annual Production 48,000,000
pieces
Production Hrs. Annual 6,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,221 761,356
kWh
Electricity Demand $27,099 10,001
kW-mo/yr
Electricity Fees $10,169 -
TOTAL YEARLY COSTS $101,489
RECOMMENDED SAVINGS* $82,562 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.2522: Isolate hot or cold equipment $19,671 $85,000 $18,197
216,632
kWh
$1,474
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,847 $21,296 $14,847
176,748
kWh
- -
03 2.4133: Use most efficient type of electric motors $9,670 $9,949 $8,986
106,975
kWh
$684
-
kW-mo/yr
-
04 2.3191: Use demand controller or load shedder $9,105 $4,096 $6,395
76,136
kWh
$2,710
-
kW-mo/yr
-
05 2.7261: Install timers and/or thermostats $5,358 $1,000 $5,358
63,783
kWh
- -
06 2.4112: Install soft-start to eliminate nuisance trips $2,811 $6,961 $2,811
33,465
kWh
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $2,210 $1,780 $2,210
26,314
kWh
- -
08 2.7124: Make a practice of turning off lights when not needed $1,380 - $1,380
16,425
kWh
- -
09 4.424: Improve space comfort conditioning $17,510 $13,200 $(-2,631.0)
(-31,332)
kWh
$(-243.0)
-
kW-mo/yr
$20,384
TOTAL RECOMMENDED $82,562 $143,282 $57,553
685,146
kWh
$4,625
-
kW-mo/yr
$20,384
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs