| Assessment Year | 2026 |
|---|---|
| Principal Product | Ice Cream |
| NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $5 M to 10M |
| # of Employees | 25 |
| Plant Area |
40,000
ft2
|
| Annual Production | 48,000,000
pieces
|
| Production Hrs. Annual | 6,400
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $64,221 | 761,356 |
kWh
|
$0.084 |
| Electricity Demand | $27,099 | 10,001 |
kW-mo/yr
|
$2.71 |
| Electricity Fees | $10,169 | - |
|
- |
| TOTAL YEARLY COSTS | $101,489 | |||
| RECOMMENDED SAVINGS* | $82,562 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2522: Isolate hot or cold equipment | $19,671 | $85,000 |
$18,197
216,632
kWh
|
$1,474
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,847 | $21,296 |
$14,847
176,748
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $9,670 | $9,949 |
$8,986
106,975
kWh
|
$684
-
kW-mo/yr
|
- | |
| 04 | 2.3191: Use demand controller or load shedder | $9,105 | $4,096 |
$6,395
76,136
kWh
|
$2,710
-
kW-mo/yr
|
- | |
| 05 | 2.7261: Install timers and/or thermostats | $5,358 | $1,000 |
$5,358
63,783
kWh
|
- | - | |
| 06 | 2.4112: Install soft-start to eliminate nuisance trips | $2,811 | $6,961 |
$2,811
33,465
kWh
|
- | - | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,210 | $1,780 |
$2,210
26,314
kWh
|
- | - | |
| 08 | 2.7124: Make a practice of turning off lights when not needed | $1,380 | - |
$1,380
16,425
kWh
|
- | - | |
| 09 | 4.424: Improve space comfort conditioning | $17,510 | $13,200 |
$(-2,631.0)
(-31,332)
kWh
|
$(-243.0)
-
kW-mo/yr
|
$20,384 | |
| TOTAL RECOMMENDED | $82,562 | $143,282 |
$57,553
685,146
kWh
|
$4,625
-
kW-mo/yr
|
$20,384 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs