ITAC Assessment: UF0639
ITAC logo
ITAC Assessment: UF0639
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Fiberglass Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 181,120
ft2
Annual Production 630
units
Production Hrs. Annual 2,150
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $382,539 4,273,668
kWh
Electricity Demand $89,932 13,323
kW-mo/yr
Electricity Fees $116,274 -
Natural Gas $208,680 93,463
MMBtu
TOTAL YEARLY COSTS $797,425
RECOMMENDED SAVINGS* $198,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,135 $18,588 $18,135
201,495
kWh
- -
02 2.3191: Use demand controller or load shedder $33,218 $22,992 $26,924
299,157
kWh
$6,294
-
kW-mo/yr
-
03 2.6231: Utilize controls to operate equipment only when needed $25,305 $25,400 $25,305
281,165
kWh
- -
04 2.4225: Install common header on compressors $6,214 $900 $6,214
69,041
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,453 - $5,453
60,594
kWh
- -
06 2.4321: Upgrade obsolete equipment $3,702 $8,000 $(-1,553.0)
(-17,250)
kWh
$(-745.0)
-
kW-mo/yr
$6,000
07 2.4321: Upgrade obsolete equipment $3,622 $396 $3,622
40,247
kWh
- -
08 2.4224: Upgrade controls on compressors $2,190 $754 $2,190
24,338
kWh
- -
09 4.424: Improve space comfort conditioning $80,680 $22,260 $(-2,466.0)
(-27,404)
kWh
$(-854.0)
-
kW-mo/yr
$84,000
10 4.652: Replace existing equipment with more suitable substitutes $20,000 $3,560 - - $20,000
TOTAL RECOMMENDED $198,519 $102,850 $83,824
931,383
kWh
$4,695
-
kW-mo/yr
$110,000
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs