Assessment Year | 2024 |
---|---|
Principal Product | Rigid Packaging |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 55 |
Plant Area |
200,000
ft2
|
Annual Production | 1,700,000,000
units
|
Production Hrs. Annual | 3,276
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $277,369 | 7,769,113 |
kWh
|
$0.036 | |
Electricity Demand | $230,294 | 34,581 |
kW-mo/yr
|
$6.66 | |
Electricity Fees | $536,824 | - |
|
- | |
Natural Gas | $4,481 | 330 |
MMBtu
|
$13.56 | |
Waste Disposal Costs | |||||
Water Usage | $7,867 | 921 |
Tgal
|
$8.54 | |
Water Disposal | $31,467 | 921 |
Tgal
|
$34.17 | |
TOTAL YEARLY COSTS | $1,088,302 | ||||
RECOMMENDED SAVINGS* | $215,322 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $50,241 | $322,608 |
$24,667
685,184
kWh
|
$25,574
-
kW-mo/yr
|
- | |
02 | 2.3191: Use demand controller or load shedder | $35,722 | $41,798 |
$19,578
543,838
kWh
|
$16,144
-
kW-mo/yr
|
- | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $24,631 | $18,563 |
$(-427.0)
(-11,848)
kWh
|
$(-421.0)
-
kW-mo/yr
|
$25,479 | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $19,913 | $25,350 |
$19,913
553,135
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $15,952 | $39,000 |
$6,442
178,936
kWh
|
$9,510
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,910 | $351 |
$6,910
191,931
kWh
|
- | - | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,473 | $24,140 |
$6,473
179,801
kWh
|
- | - | |
08 | 2.4224: Upgrade controls on compressors | $4,230 | $12,000 |
$4,230
117,495
kWh
|
- | - | |
09 | 2.4325: Upgrade conveyors | $3,290 | $8,838 |
$3,290
91,385
kWh
|
- | - | |
10 | 2.6122: Adjust vents to minimize energy use | $2,337 | $1,797 |
$2,337
64,916
kWh
|
- | - | |
11 | 2.4112: Install soft-start to eliminate nuisance trips | $1,889 | $8,355 |
$1,889
52,463
kWh
|
- | - | |
12 | 3.4116: Meter recycled water (to reduce sewer charges) | $10,444 | $4,280 | - | - | $10,444 | |
13 | 4.661: Level zero – install control systems for existing equipment | $27,969 | $60,000 |
$27,969
776,911
kWh
|
- | - | |
14 | 4.424: Improve space comfort conditioning | $5,321 | $3,260 |
$5,321
171,177
kWh
|
- | - | |
TOTAL RECOMMENDED | $215,322 | $570,340 |
$128,592
3,595,324
kWh
|
$50,807
-
kW-mo/yr
|
$35,923 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||