ITAC Assessment: UF0614
ITAC logo
ITAC Assessment: UF0614
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Rigid Packaging
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 200,000
ft2
Annual Production 1,700,000,000
units
Production Hrs. Annual 3,276
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,369 7,769,113
kWh
Electricity Demand $230,294 34,581
kW-mo/yr
Electricity Fees $536,824 -
Natural Gas $4,481 330
MMBtu
Waste Disposal Costs
Water Usage $7,867 921
Tgal
Water Disposal $31,467 921
Tgal
TOTAL YEARLY COSTS $1,088,302
RECOMMENDED SAVINGS* $215,322 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $50,241 $322,608 $24,667
685,184
kWh
$25,574
-
kW-mo/yr
-
02 2.3191: Use demand controller or load shedder $35,722 $41,798 $19,578
543,838
kWh
$16,144
-
kW-mo/yr
-
03 2.7243: Improve air circulation with destratification fans / other methods $24,631 $18,563 $(-427.0)
(-11,848)
kWh
$(-421.0)
-
kW-mo/yr
$25,479
04 2.6231: Utilize controls to operate equipment only when needed $19,913 $25,350 $19,913
553,135
kWh
- -
05 2.4133: Use most efficient type of electric motors $15,952 $39,000 $6,442
178,936
kWh
$9,510
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,910 $351 $6,910
191,931
kWh
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,473 $24,140 $6,473
179,801
kWh
- -
08 2.4224: Upgrade controls on compressors $4,230 $12,000 $4,230
117,495
kWh
- -
09 2.4325: Upgrade conveyors $3,290 $8,838 $3,290
91,385
kWh
- -
10 2.6122: Adjust vents to minimize energy use $2,337 $1,797 $2,337
64,916
kWh
- -
11 2.4112: Install soft-start to eliminate nuisance trips $1,889 $8,355 $1,889
52,463
kWh
- -
12 3.4116: Meter recycled water (to reduce sewer charges) $10,444 $4,280 - - $10,444
13 4.661: Level zero – install control systems for existing equipment $27,969 $60,000 $27,969
776,911
kWh
- -
14 4.424: Improve space comfort conditioning $5,321 $3,260 $5,321
171,177
kWh
- -
TOTAL RECOMMENDED $215,322 $570,340 $128,592
3,595,324
kWh
$50,807
-
kW-mo/yr
$35,923
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs