ITAC Assessment: UF0608
ITAC logo
ITAC Assessment: UF0608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Classic Model Cars
NAICS 336111: Automobile Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 51,000
ft2
Annual Production 60
units
Production Hrs. Annual 3,952
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,981 675,827
kWh
Electricity Demand $29,891 2,408
kW-mo/yr
Electricity Fees $8,512 -
TOTAL YEARLY COSTS $100,384
RECOMMENDED SAVINGS* $122,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,307

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $100,291 $322,608 $55,604
604,390
kWh
$44,687
-
kW-mo/yr
02 2.6231: Utilize controls to operate equipment only when needed $6,445 $25,640 $4,352
47,308
kWh
$2,093
-
kW-mo/yr
03 2.3191: Use demand controller or load shedder $6,437 $3,636 $4,352
47,307
kWh
$2,085
-
kW-mo/yr
04 2.7425: Clean or color roof to reduce solar load $3,417 $9,340 $3,417
37,149
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,526 $10,560 $1,625
17,666
kWh
$901
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,789 $7,200 $1,789
19,442
kWh
-
07 2.4224: Upgrade controls on compressors $1,138 $5,400 $1,138
12,372
kWh
-
TOTAL RECOMMENDED $122,043 $384,384 $72,277
785,634
kWh
$49,766
-
kW-mo/yr
TOTAL IMPLEMENTED $15,307 $36,136 $12,321
133,936
kWh
$2,986
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs