Assessment Year | 2024 |
---|---|
Principal Product | Classic Model Cars |
NAICS | 336111: Automobile Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
51,000
ft2
|
Annual Production | 60
units
|
Production Hrs. Annual | 3,952
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $61,981 | 675,827 |
kWh
|
$0.092 |
Electricity Demand | $29,891 | 2,408 |
kW-mo/yr
|
$12.41 |
Electricity Fees | $8,512 | - |
|
- |
TOTAL YEARLY COSTS | $100,384 | |||
RECOMMENDED SAVINGS* | $122,043 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,307 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $100,291 | $322,608 |
$55,604
604,390
kWh
|
$44,687
-
kW-mo/yr
|
|
02 | 2.6231: Utilize controls to operate equipment only when needed | $6,445 | $25,640 |
$4,352
47,308
kWh
|
$2,093
-
kW-mo/yr
|
|
03 | 2.3191: Use demand controller or load shedder | $6,437 | $3,636 |
$4,352
47,307
kWh
|
$2,085
-
kW-mo/yr
|
|
04 | 2.7425: Clean or color roof to reduce solar load | $3,417 | $9,340 |
$3,417
37,149
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,526 | $10,560 |
$1,625
17,666
kWh
|
$901
-
kW-mo/yr
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,789 | $7,200 |
$1,789
19,442
kWh
|
- | |
07 | 2.4224: Upgrade controls on compressors | $1,138 | $5,400 |
$1,138
12,372
kWh
|
- | |
TOTAL RECOMMENDED | $122,043 | $384,384 |
$72,277
785,634
kWh
|
$49,766
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $15,307 | $36,136 |
$12,321
133,936
kWh
|
$2,986
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs