Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Plastic Bottles
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 36
Plant Area 80,000
ft2
Annual Production 114,211,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $622,469 16,425,600
kWh
Electricity Demand $176,149 18,562
kW-mo/yr
Electricity Fees $84,912 -
Waste Disposal Costs
Water Usage $7,158 4,571
Tgal
Water Disposal $7,157 1,514
Tgal
TOTAL YEARLY COSTS $897,845
RECOMMENDED SAVINGS* $273,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $180,156

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.3113: Make ice during off peak hours for cooling $73,113 $215,600 $32,583
857,447
kWh
- $40,530
02 2.3191: Use demand controller or load shedder $56,023 $88,370 $43,692
1,149,792
kWh
$12,331
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $30,274 $30,607 $19,195
505,136
kWh
$11,079
-
kW-mo/yr
-
04 2.5122: Replace high resistance ducts, pipes, and fittings $15,287 $18,600 $15,712
413,481
kWh
$(-425.0)
-
kW-mo/yr
-
05 2.2623: Minimize condenser cooling water temperature $9,922 $11,796 $9,922
261,100
kWh
- -
06 2.6231: Utilize controls to operate equipment only when needed $7,412 $25,400 $7,412
195,050
kWh
- -
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $2,981 $508 $2,981
78,458
kWh
- -
08 2.6127: Maintain air filters by cleaning or replacement $1,672 $1,200 $1,672
43,900
kWh
- -
09 2.7447: Install vinyl strip / high speed / air curtain doors $1,580 $600 $1,580
41,592
kWh
- -
10 4.661: Level zero – install control systems for existing equipment $62,417 $10,000 $62,417
1,642,560
kWh
- -
11 4.663: Level two – install control system using iiot devices with communication capabilities to store data to the cloud $12,544 $20,214 $12,544
330,092
kWh
- -
TOTAL RECOMMENDED $273,225 $422,895 $209,710
5,518,608
kWh
$22,985
-
kW-mo/yr
$40,530
TOTAL IMPLEMENTED $180,156 $161,681 $157,171
4,136,019
kWh
$22,985
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs