ITAC Assessment: UF0510
ITAC logo
ITAC Assessment: UF0510
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Electronics Manufacturing
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 150,000
ft2
Annual Production 100
units
Production Hrs. Annual 3,840
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,899 2,593,595
kWh
Electricity Demand $74,950 7,203
kW-mo/yr
Electricity Fees $22,020 -
TOTAL YEARLY COSTS $240,869
RECOMMENDED SAVINGS* $1,034,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,031,422

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4224: Upgrade controls on compressors $1,528 $419 $960
17,461
kWh
$568
-
kW-mo/yr
-
02 2.2211: Use optimum temperature $1,757 - $1,175
21,362
kWh
$582
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $1,142 $225 $718
13,056
kWh
$424
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $908 $689 $908
16,512
kWh
- -
05 4.446: Automate finishing process $84,346 $5,030 $(-84.0)
(-1,536)
kWh
$(-49.9)
-
kW-mo/yr
$84,480
06 4.445: Install equipment to move product $944,640 $126,336 - - $944,640
TOTAL RECOMMENDED $1,034,321 $132,699 $3,677
66,855
kWh
$1,524
-
kW-mo/yr
$1,029,120
TOTAL IMPLEMENTED $1,031,422 $132,474 $1,784
32,437
kWh
$518
-
kW-mo/yr
$1,029,120
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs