ITAC Assessment: UF0506
ITAC logo
ITAC Assessment: UF0506
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Dynamic Weighing Equipment
NAICS 333997: Scale and Balance Manufacturing
SIC 3596: Scales and Balances, Except Laboratory
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 63,210
ft2
Annual Production 100
units
Production Hrs. Annual 4,862
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,139 1,497,016
kWh
Electricity Demand $33,324 4,560
kW-mo/yr
Electricity Fees $1,969 -
TOTAL YEARLY COSTS $166,432
RECOMMENDED SAVINGS* $78,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,533

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $5,263 $5,454 $3,716
42,415
kWh
$1,547
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,519 $1,169 $4,519
51,586
kWh
- -
03 2.4225: Install common header on compressors $4,067 $3,216 $4,067
46,430
kWh
- -
04 2.6231: Utilize controls to operate equipment only when needed $2,070 $1,171 $2,070
23,633
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,010 $6,500 $1,450
16,552
kWh
$560
-
kW-mo/yr
-
06 2.6232: Install set-back timers $1,014 $667 $1,014
11,575
kWh
- -
07 4.514: Re-arrange equipment layout to reduce handling costs $60,000 $55,338 - - $60,000
TOTAL RECOMMENDED $78,943 $73,515 $16,836
192,191
kWh
$2,107
-
kW-mo/yr
$60,000
TOTAL IMPLEMENTED $5,533 $1,836 $5,533
63,161
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs