ITAC Assessment: MI0358
ITAC logo
ITAC Assessment: MI0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Treatede Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 2,150,000
ft2
Annual Production 120,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,703,658 45,844,800
kWh
Electricity Demand $695,082 79,658
kW-mo/yr
Electricity Fees $233,912 -
Fuel Oil #2 $204,399 12,366
MMBtu
Waste Disposal Costs
Water Usage $297,500 35,000
Tgal
TOTAL YEARLY COSTS $3,134,551
RECOMMENDED SAVINGS* $1,634,954 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,549,415

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Usage Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $713,110 $8,242,656 $1,696,258
45,844,800
kWh
$695,096
-
kW-mo/yr
$204,399
-
MMBtu
- $(-1,882,643.0)
02 2.4322: Use or replace with energy efficient substitutes $478,275 $6,028,646 $339,252
9,168,960
kWh
$139,023
-
kW-mo/yr
- - -
03 2.4226: Use / purchase optimum sized compressor $270,674 $806,400 $204,444
5,525,520
kWh
$66,230
-
kW-mo/yr
- - -
04 3.7313: Eliminate oxygen loss $85,219 $51,000 $64,364
1,739,556
kWh
$20,855
-
kW-mo/yr
- - -
05 3.4151: Minimize water usage $77,140 $207,600 $(-318.0)
(-8,596)
kWh
$(-105.0)
-
kW-mo/yr
- $77,563
-
Tgal
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,962 $18,807 $6,016
162,594
kWh
$1,946
-
kW-mo/yr
- - -
07 2.7221: Lower temperature during the winter season and vice-versa $2,254 $480 $1,757
47,481
kWh
$497
-
kW-mo/yr
- - -
08 2.7425: Clean or color roof to reduce solar load $320 $1,549 $242
6,507
kWh
$78
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $1,634,954 $15,357,138 $2,312,015
62,486,822
kWh
$923,620
-
kW-mo/yr
$204,399
-
MMBtu
$77,563
-
Tgal
$(-1,882,643.0)
TOTAL IMPLEMENTED $1,549,415 $15,304,589 $2,247,409
60,740,759
kWh
$902,687
-
kW-mo/yr
$204,399
-
MMBtu
$77,563
-
Tgal
$(-1,882,643.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs