| Assessment Year | 1988 |
|---|---|
| Principal Product | FEED PELLETS & CHICKS |
| NAICS |
n/a
|
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $10 M to 50M |
| # of Employees | 85 |
| Plant Area |
n/a
|
| Annual Production | 125,000
ton
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $127,966 | 2,927,902 |
kWh
|
$0.044 |
| Natural Gas | $60,578 | 18,639 |
MMBtu
|
$3.25 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,202 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $860 | $600 | - |
$860
-
MMBtu
|
- | |
| 02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $430 | $400 | - |
$430
-
MMBtu
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $1,000 | $1,900 |
$1,000
24,033
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,240 | - |
$1,240
42,497
kWh
|
- | - | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $194 | $450 |
$194
10,844
kWh
|
- | - | |
| 06 | 2.7441: Replace broken windows and/or window sash | $1,363 | $200 |
$1,363
46,893
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $115 | $92 |
$125
2,638
kWh
|
- | $(-10.0) | |
| TOTAL RECOMMENDED | $5,202 | $3,642 |
$3,922
126,905
kWh
|
$1,290
-
MMBtu
|
$(-10.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs