ITAC Assessment: UF0444
ITAC logo
ITAC Assessment: UF0444
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Baked goods
NAICS 311811: Retail Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 320,517
ft2
Annual Production 94,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,306,207 16,749,600
kWh
Electricity Demand $73,962 31,992
kW-mo/yr
Natural Gas $508,460 93,877
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $142,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $34,948 $19,732 $34,832
428,724
kWh
$116
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $19,284 $813 $19,284
246,118
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,401 $404 $1,401
16,885
kWh
- -
04 2.6231: Utilize controls to operate equipment only when needed $35,428 $25,300 $35,428
454,212
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,135 $1,000 $1,135
14,552
kWh
- -
06 2.7496: Install partitions to reduce size of conditioned space $1,175 $4,385 $1,175
15,065
kWh
- -
07 2.4112: Install soft-start to eliminate nuisance trips $2,862 $2,729 $2,862
34,479
kWh
- -
08 2.7226: Use computer programs to optimize hvac performance $14,978 $39,066 $14,929
180,456
kWh
$49
-
kW-mo/yr
-
09 2.7124: Make a practice of turning off lights when not needed $616 - $616
7,907
kWh
- -
10 2.7111: Reduce illumination to minimum necessary levels $4,606 $930 $4,606
59,055
kWh
- -
11 2.2514: Cover open tanks $9,431 $2,321 - - $9,431
-
MMBtu
12 2.1222: Install turbulators $16,282 $7,500 - - $16,282
-
MMBtu
TOTAL RECOMMENDED $142,146 $104,180 $116,268
1,457,453
kWh
$164
-
kW-mo/yr
$25,713
-
MMBtu
TOTAL IMPLEMENTED $56,768 $21,949 $56,652
706,279
kWh
$116
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings