Assessment Year | 1987 |
---|---|
Principal Product | LETHOGRAPHIC PRINTING |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 312 |
Plant Area |
n/a
|
Annual Production | 1,407,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $261,955 | 4,626,026 |
kWh
|
$0.057 |
Natural Gas | $42,926 | 12,061 |
MMBtu
|
$3.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,699 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,035 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $1,664 | $69 |
$229
4,689
kWh
|
$1,435
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,314 | $177 |
$1,314
27,843
kWh
|
- | |
03 | 2.2711: Utilize outside air instead of conditioned air for drying | $1,886 | $2,394 |
$903
21,688
kWh
|
$983
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $835 | $689 |
$835
14,654
kWh
|
- | |
TOTAL RECOMMENDED | $5,699 | $3,329 |
$3,281
68,874
kWh
|
$2,418
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,035 | $3,260 |
$3,052
64,185
kWh
|
$983
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs