ITAC Assessment: UF0432
ITAC logo
ITAC Assessment: UF0432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Mrhyl Ester
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area 22,000
ft2
Annual Production 19,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,617 2,045,888
kWh
Electricity Demand $36,740 4,584
kW-mo/yr
Electricity Fees $28,122 -
Natural Gas $101,961 14,471
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $33,739 $32,047 $33,434
334,150
kWh
$305
-
kW-mo/yr
- -
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $4,188 $5,591 - - $4,188
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $14,940 $2,240 $14,735
140,758
kWh
$205
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,539 $719 $1,539
17,095
kWh
- - -
05 2.7134: Use photocell controls $6,416 $768 $6,416
59,405
kWh
- - -
06 2.4225: Install common header on compressors $1,520 - $1,520
14,079
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,000 $2,700 $3,000
27,781
kWh
- - -
08 2.4151: Develop a repair/replace policy $364 - $364
4,013
kWh
- - -
09 2.2615: Clean condenser tubes $1,343 $120 $1,343
12,438
kWh
- - -
10 2.4156: Establish a preventative maintenance program $3,120 - - - - $3,120
11 2.4221: Install compressor air intakes in coolest locations $8,637 $1,500 $8,637
95,966
kWh
- - -
TOTAL RECOMMENDED $78,806 $45,685 $70,988
705,685
kWh
$510
-
kW-mo/yr
$4,188
-
MMBtu
$3,120
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs