ITAC Assessment: SD0612
ITAC logo
ITAC Assessment: SD0612
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Malt Products
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 144
Plant Area 68,255
ft2
Annual Production 3,100
Tgal
Production Hrs. Annual 4,750
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,139 1,808,852
kWh
Electricity Demand $253,987 6,034
kW-mo/yr
Electricity Fees $64,576 -
Natural Gas $206,065 25,885
MMBtu
TOTAL YEARLY COSTS $710,767
RECOMMENDED SAVINGS* $77,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,161

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.5194: Redesign process $39,942 $13,000 $25,594
248,726
kWh
$14,348
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,879 $12,356 $5,723
55,617
kWh
$5,906
-
kW-mo/yr
$250 -
03 2.4133: Use most efficient type of electric motors $4,826 $9,545 $2,372
23,054
kWh
$2,454
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $957 - $957
9,297
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,530 $9,245 $825
8,016
kWh
$1,705
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,883 $2,800 $614
5,967
kWh
$1,269
-
kW-mo/yr
- -
07 2.2437: Recover waste heat from equipment $14,829 $44,568 - - - $14,829
-
MMBtu
08 2.2135: Repair and eliminate steam leaks $557 $1,000 - - - $557
-
MMBtu
TOTAL RECOMMENDED $77,403 $92,514 $36,085
350,677
kWh
$25,682
-
kW-mo/yr
$250 $15,386
-
MMBtu
TOTAL IMPLEMENTED $58,161 $35,901 $34,646
336,694
kWh
$22,708
-
kW-mo/yr
$250 $557
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs