Assessment Year | 2021 |
---|---|
Principal Product | Malt Products |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $10 M to 50M |
# of Employees | 144 |
Plant Area |
68,255
ft2
|
Annual Production | 3,100
Tgal
|
Production Hrs. Annual | 4,750
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $186,139 | 1,808,852 |
kWh
|
$0.10 |
Electricity Demand | $253,987 | 6,034 |
kW-mo/yr
|
$42.10 |
Electricity Fees | $64,576 | - |
|
- |
Natural Gas | $206,065 | 25,885 |
MMBtu
|
$7.96 |
TOTAL YEARLY COSTS | $710,767 | |||
RECOMMENDED SAVINGS* | $77,403 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,161 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.5194: Redesign process | $39,942 | $13,000 |
$25,594
248,726
kWh
|
$14,348
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,879 | $12,356 |
$5,723
55,617
kWh
|
$5,906
-
kW-mo/yr
|
$250 | - | |
03 | 2.4133: Use most efficient type of electric motors | $4,826 | $9,545 |
$2,372
23,054
kWh
|
$2,454
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $957 | - |
$957
9,297
kWh
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,530 | $9,245 |
$825
8,016
kWh
|
$1,705
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,883 | $2,800 |
$614
5,967
kWh
|
$1,269
-
kW-mo/yr
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $14,829 | $44,568 | - | - | - |
$14,829
-
MMBtu
|
|
08 | 2.2135: Repair and eliminate steam leaks | $557 | $1,000 | - | - | - |
$557
-
MMBtu
|
|
TOTAL RECOMMENDED | $77,403 | $92,514 |
$36,085
350,677
kWh
|
$25,682
-
kW-mo/yr
|
$250 |
$15,386
-
MMBtu
|
||
TOTAL IMPLEMENTED | $58,161 | $35,901 |
$34,646
336,694
kWh
|
$22,708
-
kW-mo/yr
|
$250 |
$557
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs