Assessment Year | 2009 |
---|---|
Principal Product | bottled water |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | greater than $500 M |
# of Employees | 217 |
Plant Area |
9,425,687
ft2
|
Annual Production | 975,636,174
units
|
Production Hrs. Annual | 8,740
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,384,586 | 32,238,082 |
kWh
|
$0.074 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $872,578 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,083 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|
01 | 2.7225: Close outdoor air dampers during warm-up / cool-down periods | $20,276 | $4,000 |
$20,276
270,348
kWh
|
- | - | |
02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $146,810 | $3,192 | - |
$146,810
-
MMBtu
|
- | |
03 | 3.5318: Recycle fluorescent lamps | $328 | $3,405 | - | - | $328 | |
04 | 2.7145: Install skylights | $2,555 | $238 |
$2,555
23,514
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $1,764 | $481 |
$1,764
17,476
kWh
|
- | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $50,000 | $25,000 |
$50,000
3,800
kWh
|
- | - | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $2,382 | $2,382 |
$2,382
31,765
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $234,287 | $67,220 |
$234,287
2,718,202
kWh
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $3,528 | $628 |
$3,528
47,041
kWh
|
- | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,591 | $568 |
$6,591
87,873
kWh
|
- | - | |
11 | 2.7135: Install occupancy sensors | $24,539 | - |
$24,539
327,186
kWh
|
- | - | |
12 | 2.7141: Lower light fixtures in high ceiling areas | $37,500 | $4,483 |
$37,500
505,452
kWh
|
- | - | |
13 | 2.4225: Install common header on compressors | $229,898 | - |
$229,898
3,065,303
kWh
|
- | - | |
14 | 2.4151: Develop a repair/replace policy | $1,083 | - |
$1,083
10,742
kWh
|
- | - | |
15 | 2.2441: Preheat boiler makeup water with waste process heat | $111,037 | $4,000 | - |
$111,037
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $872,578 | $115,597 |
$614,403
7,108,702
kWh
|
$257,847
-
MMBtu
|
$328 | ||
TOTAL IMPLEMENTED | $6,083 | $866 |
$6,083
70,555
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs