Assessment Year | 2009 |
---|---|
Principal Product | Dimensioned Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
177,000
ft2
|
Annual Production | 180,000,000
units
|
Production Hrs. Annual | 2,704
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $867,717 | 11,797,340 |
kWh
|
$0.074 |
Fuel Oil #1 | $121,727 | 4,140 |
MMBtu
|
$29.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $151,240 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #1 Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $53,117 | $28,843 |
$53,117
717,791
kWh
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $151 | $562 |
$151
2,047
kWh
|
- | - | - | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $11,733 | $397 |
$11,733
158,558
kWh
|
- | - | - | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $2,063 | $425 |
$2,063
27,875
kWh
|
- | - | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $31,025 | $24,740 | - | - | $31,025 | - | |
06 | 2.7423: Reduce heat gain by window tinting | $790 | $800 |
$790
10,680
kWh
|
- | - | - | |
07 | 3.5313: Increase amount of waste recovered for resale | $512 | $2,500 | - | - | - | $512 | |
08 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,080 | $512 |
$48
646
kWh
|
- | $1,032 | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,732 | $564 |
$1,732
23,409
kWh
|
- | - | - | |
10 | 2.4239: Eliminate or reduce compressed air usage | $9,752 | $300 |
$9,752
131,789
kWh
|
- | - | - | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,525 | - |
$2,525
34,124
kWh
|
- | - | - | |
12 | 2.4224: Upgrade controls on compressors | $6,440 | $6,884 |
$6,440
87,033
kWh
|
- | - | - | |
13 | 2.4224: Upgrade controls on compressors | $14,512 | $12,272 |
$14,512
196,115
kWh
|
- | - | - | |
14 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $13,923 | - | - |
$13,923
-
MMBtu
|
- | - | |
15 | 2.6125: Keep equipment clean | $1,885 | $816 |
$1,885
25,480
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $151,240 | $79,615 |
$104,748
1,415,547
kWh
|
$13,923
-
MMBtu
|
$32,057 | $512 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #1 Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs