ITAC Assessment: UF0421
ITAC logo
ITAC Assessment: UF0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product joints decks
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 5511: Motor Vehicle Dealers (New and Used)
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 296,248
ft2
Annual Production 38,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $657,084 5,570,400
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,166

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7135: Install occupancy sensors $4,519 $1,280 $4,519
38,300
kWh
02 2.4133: Use most efficient type of electric motors $31,204 $62,181 $31,204
225,546
kWh
03 2.4225: Install common header on compressors $2,293 - $2,293
19,434
kWh
04 2.7145: Install skylights $1,691 $11,790 $1,691
14,334
kWh
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $3,680 $2,262 $3,680
28,080
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $12,375 $8,700 $12,375
95,004
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,873 $515 $5,873
49,767
kWh
08 2.6212: Turn off equipment during breaks, reduce operating time $16,017 - $16,017
135,739
kWh
09 2.4151: Develop a repair/replace policy $2,717 - $2,717
20,485
kWh
TOTAL RECOMMENDED $80,369 $86,728 $80,369
626,689
kWh
TOTAL IMPLEMENTED $8,166 $515 $8,166
69,201
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs