Assessment Year | 1998 |
---|---|
Principal Product | Low Volatage Aluminum Electrical Cable |
NAICS |
n/a
|
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $100 M to 500M |
# of Employees | 245 |
Plant Area |
237,450
ft2
|
Annual Production | 45,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $558,678 | 16,221,571 |
kWh
|
$0.034 |
Electricity Demand | $115,640 | 2,743 |
kW-mo/yr
|
$42.16 |
Electricity Fees | $33,786 | - |
|
- |
Natural Gas | $189,057 | 51,180 |
MMBtu
|
$3.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,031 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,620 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.611: Begin a practice of predictive / preventative maintenance | $21,816 | $9,450 | - | - | - | - | $21,816 | |
02 | 2.4221: Install compressor air intakes in coolest locations | $3,742 | $77 |
$3,278
88,804
kWh
|
$464
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,685 | $40 |
$2,348
63,599
kWh
|
$337
-
kW-mo/yr
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $21,238 | $33,352 |
$18,708
506,741
kWh
|
$2,530
-
kW-mo/yr
|
- | - | - | |
05 | 3.5217: Reuse / recycle/ sell paper products | $23,640 | - | - | - | - |
$23,640
-
lb
|
- | |
06 | 3.3128: Utilize other methods to remove contaminants | $910 | $1,000 | - | - |
$910
-
gal
|
- | - | |
TOTAL RECOMMENDED | $74,031 | $43,919 |
$24,334
659,144
kWh
|
$3,331
-
kW-mo/yr
|
$910
-
gal
|
$23,640
-
lb
|
$21,816 | ||
TOTAL IMPLEMENTED | $48,620 | $33,429 |
$21,986
595,545
kWh
|
$2,994
-
kW-mo/yr
|
- |
$23,640
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs