ITAC Assessment: UF0415
ITAC logo
ITAC Assessment: UF0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product insolators and roofing
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 100,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $538,997 5,783,782
kWh
Natural Gas $183,364 17,235
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $146,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1131: Repair faulty insulation in furnaces, boilers, etc $662 $300 $662
7,113
kWh
-
02 2.2441: Preheat boiler makeup water with waste process heat $19,825 $20,000 - $19,825
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $7,271 $400 $7,271
100,988
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $34,736 $30,084 $34,736
541,032
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $666 - $666
9,248
kWh
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $27,511 $182,894 $27,511
256,683
kWh
-
07 2.4151: Develop a repair/replace policy $648 - $648
6,720
kWh
-
08 2.4225: Install common header on compressors $6,290 $550 $6,290
87,360
kWh
-
09 2.7243: Improve air circulation with destratification fans / other methods $49,178 $49,400 $49,178
553,225
kWh
-
TOTAL RECOMMENDED $146,787 $283,628 $126,962
1,562,369
kWh
$19,825
-
MMBtu
TOTAL IMPLEMENTED $36,050 $30,084 $36,050
557,000
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs