ITAC Assessment: TN0461
ITAC logo
ITAC Assessment: TN0461
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MOP YARN AND MOP HEADS
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 6,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $368,961 6,145,369
kWh
Natural Gas $19,807 3,753
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $41,641 $47,895 $38,986
649,766
kWh
- $2,655
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,756 $1,000 - $2,756
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,074 $1,380 $9,074
151,231
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $17,188 $2,188 $15,000
250,000
kWh
- $2,188
05 2.6211: Conserve energy by efficient use of vending machines $1,758 $1,535 $1,758
29,308
kWh
- -
06 2.7221: Lower temperature during the winter season and vice-versa $1,178 - $1,178
19,637
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $598 $480 $598
9,965
kWh
- -
08 2.3212: Optimize plant power factor $29,700 $32,400 $29,700
-
kWh
- -
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,582 - $14,582
-
kWh
- -
TOTAL RECOMMENDED $118,475 $86,878 $110,876
1,109,907
kWh
$2,756
-
MMBtu
$4,843
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs