ITAC Assessment: OK0446
ITAC logo
ITAC Assessment: OK0446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Chain conveyors
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 49,300
ft2
Annual Production 250
pieces
Production Hrs. Annual 7,433
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,019 567,409
kWh
Natural Gas $22,678 4,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,524 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7314: Reduce ventilation air $8,869 $22,080 - $8,869
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,792 $2,333 $1,792
16,999
kWh
- -
03 2.8121: Apply for tax-free status for energy purchases $1,196 - - - $1,196
04 2.7142: Utilize higher efficiency lamps and/or ballasts $680 $223 $680
7,034
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $529 - $529
8,499
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $296 $220 $296
4,103
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $162 - $162
2,345
kWh
- -
TOTAL RECOMMENDED $13,524 $24,856 $3,459
38,980
kWh
$8,869
-
MMBtu
$1,196
TOTAL IMPLEMENTED $1,725 - $529
8,499
kWh
- $1,196