ITAC Assessment: OK0828
ITAC logo
ITAC Assessment: OK0828
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Aircraft products
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 529
Plant Area 165,470
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $324,407 8,036,906
kWh
Electricity Demand $154,992 18,326
kW-mo/yr
Natural Gas $69,300 9,472
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,761 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,844

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,556 $1,400 $2,556
63,893
kWh
- - -
02 2.2437: Recover waste heat from equipment $3,671 $3,025 - - - $3,671
-
MMBtu
03 2.2437: Recover waste heat from equipment $2,911 $4,506 - - - $2,911
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $861 $1,822 $436
10,891
kWh
$425
-
kW-mo/yr
- -
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $807 $1,615 $807
20,181
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $8,514 $54,333 $5,976
149,388
kWh
$2,538
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,604 $30,015 $2,505
62,698
kWh
$1,099
-
kW-mo/yr
- -
08 2.7241: Install outside air damper / economizer on hvac unit $12,840 $23,750 $12,840
320,995
kWh
- - -
09 2.7243: Improve air circulation with destratification fans / other methods $3,664 $14,850 $(-217.0)
(-5,413)
kWh
$(-228.0)
-
kW-mo/yr
- $4,109
-
MMBtu
10 2.6232: Install set-back timers $1,768 $957 - - - $1,768
-
MMBtu
11 2.7226: Use computer programs to optimize hvac performance $14,142 $35,000 $5,486
137,143
kWh
- - $8,656
-
MMBtu
12 2.7232: Replace existing hvac unit with high efficiency model $13,502 $139,769 $10,203
255,087
kWh
$3,299
-
kW-mo/yr
- -
13 2.7211: Clean and maintain refrigerant condensers and towers $3,427 $1,515 $2,589
64,731
kWh
$838
-
kW-mo/yr
- -
14 2.3212: Optimize plant power factor $3,494 $8,250 - - $3,494 -
TOTAL RECOMMENDED $75,761 $320,807 $43,181
1,079,594
kWh
$7,971
-
kW-mo/yr
$3,494 $21,115
-
MMBtu
TOTAL IMPLEMENTED $6,844 $4,737 $5,581
139,515
kWh
$1,263
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs