Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Applied Coatings
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 44
Plant Area 75,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,352 1,272,567
kWh
Electricity Demand $25,904 4,603
kW-mo/yr
Electricity Fees $3,635 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,641 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $900 $238
4,689
kWh
$178
-
kW-mo/yr
02 2.4113: Install motor voltage controller on lightly loaded motors $4,051 $3,290 $3,071
61,841
kWh
$980
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,972 $800 $10,972
220,399
kWh
-
04 2.6218: Turn off equipment when not in use $2,202 - $2,202
44,256
kWh
-
TOTAL RECOMMENDED $17,641 $4,990 $16,483
331,185
kWh
$1,158
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs