Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $10
M
to 50
M
# of Employees 167
Plant Area 128,500
ft2
Annual Production 2,100
pieces
Production Hrs. Annual 2,550
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,243 826,368
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,194 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,214

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,187 $14 $1,187
14,025
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,833 $839 $3,833
47,974
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,536 $121 $1,536
18,135
kWh
-
04 2.4226: Use / purchase optimum sized compressor $1,222 $2 $1,222
14,433
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $788 $168 $788
13,559
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $822 $5 $822
9,706
kWh
-
07 2.7135: Install occupancy sensors $344 $924 $344
4,066
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $733 $1 $733
9,139
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $233 $548 $233
2,754
kWh
-
10 3.3125: Use distillation, evaporation to remove contaminants $20,227 $341 - $20,227
-
gal
11 2.4322: Use or replace with energy efficient substitutes $16,269 $67 $16,269
192,071
kWh
-
TOTAL RECOMMENDED $47,194 $3,030 $26,967
325,862
kWh
$20,227
-
gal
TOTAL IMPLEMENTED $24,214 $1,749 $24,214