Assessment Year | 2005 |
---|---|
Principal Product | Trailers |
NAICS | 336212: Truck Trailer Manufacturing |
SIC | 3715: Truck Trailers |
Sales Range | $10 M to 50M |
# of Employees | 167 |
Plant Area |
128,500
ft2
|
Annual Production | 2,100
pieces
|
Production Hrs. Annual | 2,550
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $69,243 | 826,368 |
kWh
|
$0.084 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,194 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,214 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,187 | $14 |
$1,187
14,025
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,833 | $839 |
$3,833
47,974
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,536 | $121 |
$1,536
18,135
kWh
|
- | |
04 | 2.4226: Use / purchase optimum sized compressor | $1,222 | $2 |
$1,222
14,433
kWh
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $788 | $168 |
$788
13,559
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $822 | $5 |
$822
9,706
kWh
|
- | |
07 | 2.7135: Install occupancy sensors | $344 | $924 |
$344
4,066
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $733 | $1 |
$733
9,139
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $233 | $548 |
$233
2,754
kWh
|
- | |
10 | 3.3125: Use distillation, evaporation to remove contaminants | $20,227 | $341 | - |
$20,227
-
gal
|
|
11 | 2.4322: Use or replace with energy efficient substitutes | $16,269 | $67 |
$16,269
192,071
kWh
|
- | |
TOTAL RECOMMENDED | $47,194 | $3,030 |
$26,967
325,862
kWh
|
$20,227
-
gal
|
||
TOTAL IMPLEMENTED | $24,214 | $1,749 |
$24,214
293,338
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs