| Assessment Year | 2006 |
|---|---|
| Principal Product | Fruit Juice |
| NAICS | 312111: Soft Drink Manufacturing |
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | n/a |
| # of Employees | 64 |
| Plant Area |
81,000
ft2
|
| Annual Production | 100
Tgal
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $428,133 | 5,728,380 |
kWh
|
$0.075 |
| Electricity Demand | $45,122 | 24,224 |
kW-mo/yr
|
$1.86 |
| Natural Gas | $110,013 | 10,019 |
MMBtu
|
$10.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,794 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,746 | $4,846 |
$5,725
73,280
kWh
|
$21
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,378 | $1,688 |
$4,374
17,148
kWh
|
$4
-
kW-mo/yr
|
- | |
| 03 | 2.7135: Install occupancy sensors | $341 | $342 |
$341
4,544
kWh
|
- | - | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $922 | $2,346 |
$922
12,287
kWh
|
- | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $7,286 | $1,238 | - | - |
$7,286
-
MMBtu
|
|
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,957 | - |
$1,957
22,045
kWh
|
- | - | |
| 07 | 2.2136: Install / repair insulation on steam lines | $193 | $374 | - | - |
$193
-
MMBtu
|
|
| 08 | 2.6231: Utilize controls to operate equipment only when needed | $1,088 | $93 |
$1,088
11,508
kWh
|
- | - | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $3,663 | $1,320 |
$3,663
48,846
kWh
|
- | - | |
| 10 | 2.7134: Use photocell controls | $553 | $240 |
$546
6,334
kWh
|
$7
-
kW-mo/yr
|
- | |
| 11 | 2.2442: Preheat combustion air with waste heat | $12,667 | $65,000 | - | - |
$12,667
-
MMBtu
|
|
| TOTAL RECOMMENDED | $38,794 | $77,487 |
$18,616
195,992
kWh
|
$32
-
kW-mo/yr
|
$20,146
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs