| Assessment Year | 2006 |
|---|---|
| Principal Product | Ornamental fence |
| NAICS | 332618: Other Fabricated Wire Product Manufacturing |
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $50 M to 100M |
| # of Employees | 450 |
| Plant Area |
450,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $735,589 | 13,025,994 |
kWh
|
$0.056 |
| Electricity Demand | $189,488 | 38,412 |
kW-mo/yr
|
$4.93 |
| Natural Gas | $1,213,048 | 143,667 |
MMBtu
|
$8.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $134,143 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7314: Reduce ventilation air | $35,971 | $12,184 | - |
$35,971
-
MMBtu
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $75,048 | $240,000 | - |
$75,048
-
MMBtu
|
- | |
| 03 | 2.2437: Recover waste heat from equipment | $8,567 | $34,652 | - |
$8,567
-
MMBtu
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $5,034 | $1,994 |
$5,034
77,263
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $506 | $430 |
$506
12,395
kWh
|
- | - | |
| 06 | 2.7229: Air condition only space necessary | $6,517 | $2,295 | - |
$6,517
-
MMBtu
|
- | |
| 07 | 4.611: Begin a practice of predictive / preventative maintenance | $2,500 | - | - | - | $2,500 | |
| TOTAL RECOMMENDED | $134,143 | $291,555 |
$5,540
89,658
kWh
|
$126,103
-
MMBtu
|
$2,500 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs