ITAC Assessment: UF0288
ITAC logo
ITAC Assessment: UF0288
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Cookies
NAICS
n/a
SIC 2052: Cookies and Crackers
Sales Range n/a
# of Employees 200
Plant Area 68,500
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,132 3,156,320
kWh
Electricity Demand $47,669 6,575
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $950,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $205,913

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,662 $6,465 $4,540
103,172
kWh
$1,122
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,358 $500 $4,418
61,355
kWh
- $(-60.0) - -
03 2.6231: Utilize controls to operate equipment only when needed $18,443 $30,000 $18,443
419,159
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,155 - $3,155
43,825
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $800 $2,000 $800
11,119
kWh
- - - -
06 4.522: Modify storage space to avoid rental of a warehouse $720,000 $559,440 - - - $720,000 -
07 4.711: Initiate a total quality management program $169,000 $176,000 - - - - $169,000
08 4.651: Install back-up equipment $29,400 $64,000 - - - - $29,400
TOTAL RECOMMENDED $950,818 $838,405 $31,356
638,630
kWh
$1,122
-
kW-mo/yr
$(-60.0) $720,000 $198,400
TOTAL IMPLEMENTED $205,913 $240,500 $7,573
105,180
kWh
- $(-60.0) - $198,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs