ITAC Assessment: OK1040
ITAC logo
ITAC Assessment: OK1040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Architectural fencing
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $100
M
to 500
M
# of Employees 523
Plant Area 696,530
ft2
Annual Production 60,000
ton
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $994,163 18,757,788
kWh
Electricity Demand $464,296 58,402
kW-mo/yr
Natural Gas $464,451 171,384
MMBtu
Waste Disposal Costs
Water Usage $66,394 27,080
Tgal
TOTAL YEARLY COSTS $1,989,304
RECOMMENDED SAVINGS* $114,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $83,427 $407,400 - - $83,427 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $25,167 $70,338 $15,961
301,142
kWh
$9,206
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,923 $2,911 $3,923
74,013
kWh
- - -
04 2.2437: Recover waste heat from equipment $2,152 $4,457 - - - $2,152
-
MMBtu
TOTAL RECOMMENDED $114,669 $485,106 $19,884
375,155
kWh
$9,206
-
kW-mo/yr
$83,427 $2,152
-
MMBtu
TOTAL IMPLEMENTED $6,075 $7,368 $3,923
74,013
kWh
- - $2,152
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs