Assessment Year | 2000 |
---|---|
Principal Product | Quilting Machines |
NAICS |
n/a
|
SIC | 3552: Textile Machinery |
Sales Range | $10 M to 50M |
# of Employees | 205 |
Plant Area |
65,000
ft2
|
Annual Production | 600
pieces
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $103,463 | 1,448,417 |
kWh
|
$0.071 |
Electricity Demand | $31,844 | 3,912 |
kW-mo/yr
|
$8.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,493 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,696 | $10,710 |
$4,719
96,424
kWh
|
$1,977
-
kW-mo/yr
|
- | - | - | |
02 | 2.7141: Lower light fixtures in high ceiling areas | $17,512 | $21,931 |
$9,081
185,229
kWh
|
$8,756
-
kW-mo/yr
|
- | $(-325.0) | - | |
03 | 2.8121: Apply for tax-free status for energy purchases | $6,321 | $50 | - | - | - | $6,321 | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,910 | $647 |
$972
19,930
kWh
|
$938
-
kW-mo/yr
|
- | - | - | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $7,535 | $9,667 |
$7,535
106,096
kWh
|
- | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $511 | - |
$511
7,327
kWh
|
- | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $833 | $590 |
$911
12,896
kWh
|
- | - | $(-78.0) | - | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,994 | $4,990 |
$5,994
84,408
kWh
|
- | - | - | - | |
09 | 2.6231: Utilize controls to operate equipment only when needed | $18,487 | $13,000 |
$18,487
377,198
kWh
|
- | - | - | - | |
10 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $2,000 | - | - | - | - | $2,000 | - | |
11 | 4.515: Install shelves / racks to utilize unused space | $58,300 | $87,900 | - | - | $20,800 | - | $37,500 | |
12 | 4.652: Replace existing equipment with more suitable substitutes | $741 | $520 |
$159
3,224
kWh
|
$36
-
kW-mo/yr
|
- | $546 | - | |
TOTAL RECOMMENDED | $126,840 | $150,005 |
$48,369
892,732
kWh
|
$11,707
-
kW-mo/yr
|
$20,800 | $8,464 | $37,500 | ||
TOTAL IMPLEMENTED | $43,493 | $30,507 |
$31,753
601,407
kWh
|
$2,951
-
kW-mo/yr
|
- | $8,789 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs