ITAC Assessment: UF0260
ITAC logo
ITAC Assessment: UF0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Quilting Machines
NAICS
n/a
SIC 3552: Textile Machinery
Sales Range $10
M
to 50
M
# of Employees 205
Plant Area 65,000
ft2
Annual Production 600
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,463 1,448,417
kWh
Electricity Demand $31,844 3,912
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,493

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,696 $10,710 $4,719
96,424
kWh
$1,977
-
kW-mo/yr
- - -
02 2.7141: Lower light fixtures in high ceiling areas $17,512 $21,931 $9,081
185,229
kWh
$8,756
-
kW-mo/yr
- $(-325.0) -
03 2.8121: Apply for tax-free status for energy purchases $6,321 $50 - - - $6,321 -
04 2.4133: Use most efficient type of electric motors $1,910 $647 $972
19,930
kWh
$938
-
kW-mo/yr
- - -
05 2.7491: Insulate glazing, walls, ceilings, and roofs $7,535 $9,667 $7,535
106,096
kWh
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $511 - $511
7,327
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $833 $590 $911
12,896
kWh
- - $(-78.0) -
08 2.7447: Install vinyl strip / high speed / air curtain doors $5,994 $4,990 $5,994
84,408
kWh
- - - -
09 2.6231: Utilize controls to operate equipment only when needed $18,487 $13,000 $18,487
377,198
kWh
- - - -
10 3.5212: Regrind, reuse, or sell scrap plastic parts $2,000 - - - - $2,000 -
11 4.515: Install shelves / racks to utilize unused space $58,300 $87,900 - - $20,800 - $37,500
12 4.652: Replace existing equipment with more suitable substitutes $741 $520 $159
3,224
kWh
$36
-
kW-mo/yr
- $546 -
TOTAL RECOMMENDED $126,840 $150,005 $48,369
892,732
kWh
$11,707
-
kW-mo/yr
$20,800 $8,464 $37,500
TOTAL IMPLEMENTED $43,493 $30,507 $31,753
601,407
kWh
$2,951
-
kW-mo/yr
- $8,789 -